Author Archives: Jeff Harrison
Double Rock Project

Stream realignment and restoration. Slope failure and repair with re-stabilization and underdrain system. Building of slope protection utilizing imbricated rock.
New Brunswick Project

Locating damaged mooring piles under water, extraction & replacement using GPS positioning Which required setting pipe pile in grouted rock socket. Then filling pile with grout using tremme method.